Beddard Roofing was appointed to carry out works on this Glossop-based business. The following points are how the project was undertaken and we achieved the programme with great customer satisfaction.

  • Erect safety scaffolding around the building for the duration of the work
  • Carefully remove and dispose of the ridge tiles, roof slates, laths and felt
  • Carefully remove both chimney stacks to below roof level
  • Check all timber and current insulation levels and advise accordingly
  • Felt the roof using fully breathable roofing felt to meet BS5534 requirements
  • Lath the roof using treated, graded laths to meet BS5534 requirements
  • Carefully remove and dispose of the guttering, downspouts and all timber barge/fascia boards
  • Fit new black plastic fascia, barge boards, guttering and downspouts
  • Fit new lead work to the front valleys
  • Fit new fascia ventilation and eve support trays
  • Tile the roof using a smooth grey concrete roof tile to match the rear lower level roof
  • Fit new dry verge system to all the gable ends
  • Fit new ridge tiles using a dry ridge system
  • Remove scaffolding and all debris from site